Laserfiche WebLink
i L__ , <br />Er", <br />25 <br />Fuel Source <br />• Landfill gas from <br />decomposing garbage <br />• Composed of 52% <br />methane, 40% carbon <br />dioxide, 8% other <br />• 76 collection points <br />• Estimated 30 year <br />production life <br />Landfill Gas to Electric Plant <br />• 5,100 Sq. Ft. Power Plant <br />• Contains for 800 kW Caterpillar <br />engine- generators <br />• Annual output = 25.5 million kWh <br />Production equivalent to 9% or <br />ERMU needs <br />720 Sq. Ft. Environmental Learning <br />Center <br />Eneine- Generators [4] <br />• 16 cylinder, 1,200 hp Caterpillar <br />Consume over 1,200 cubic feet per <br />minute <br />• Oil change every 750 hours <br />• Routine engine overhaul semi- <br />annual and complete overhaul and <br />refurbish ever 5 years <br />Generate 4,160 volt AC <br />