My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.8. EDSR 01-20-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2015
>
01-20-2015
>
6.8. EDSR 01-20-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2015 2:10:07 PM
Creation date
1/16/2015 2:25:07 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
1/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'future' service and body areas will be built immediately, however are not included in <br />the cost estimate. Building the 'future' areas immediately (GATR's ideal situation) will <br />add an additional $1.2M to the building cost. Once we move forward on the land <br />purchase, additional details will be determined, and a detailed construction statement <br />will be provided to staff. <br />2. I assume preliminary information has been submitted to the county (building materials, si .Ze, layout, design <br />for them to base their value estimate. Please include this infor- nation for the EDA to consider. <br />Information provided to County <br />• Truck dealership <br />• Building materials comparable to existing buildings in Northstar Business Park & Nature's Edge <br />Business Center <br />• Both parcels will have C -3 zoning <br />• 46,000 square feet (5,000 office), approximately 120'x 300' <br />• Estimated cost of construction = $100 /sq.ft. <br />• 32' building height <br />Information provided by County <br />• Land = $1,550,000 ($2.50 per foot guestimate) <br />• Building = $3,047,800 ($66.25 per foot) <br />• Total Value = $4,597,800 <br />Using 2015 proposed rates: Total Tax = $194,854 <br />• County = $47,488 <br />• City = $43,154 <br />• School = $46,399 <br />• State = $46,515 <br />• MV Tax = $6,743 <br />• Other = $4,555 <br />3. Doesyour client anticipate signing a minimum assessment agreement? <br />GATR Truck Center is willing to sign a minimum assessment agreement. <br />4. The job pay range is between $12 to $'900 per hour (or $125. Are the six sales positions (up to $1251 <br />hr.) commission - based? <br />The sales positions are commission based; however detailed pay plans are proprietary and are <br />negotiated with each position. Top sales positions within GATR trucking earned approximately <br />$185/hr in 2014. The Sales Manager, Parts and Sales positions are commission based. <br />5. Upon opening you state they will have 23 jobs. After twoyears it looks as though 40 -50 jobs are created. <br />Are these in addition to the 23 jobs? <br />
The URL can be used to link to this page
Your browser does not support the video tag.