Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Owner: City of Elk River <br />Application Number <br />Oats of application <br />Work completed through <br />12/30/2014 <br />12/30/2014 <br />EJUDU A0. U -62U (7,UUA EdttUM) <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. <br />Page 6 of 6 <br />Item <br />B <br />C <br />D <br />E <br />Total Completed <br />and Stored to Dais <br />(C + D + E) <br />% <br />Balance to <br />Pay Item Number <br />Description <br />Scheduled Value <br />From Previous <br />Application (C +D) <br />This Period <br />Materials Presently <br />Stored (not in Col D) <br />U <br />Finish <br />15400.3 <br />-Waste & Vent Piping <br />15400.3.1 <br />- Purchase <br />$30,000.00 <br />$0.00 <br />$0.00 <br />0,00 <br />$30,000.00 <br />15400,3.2 <br />- Install <br />$62,000.00 <br />$0.00 <br />$0.00 <br />O.ocl <br />$62,000.00 <br />15480 <br />Packaged Compressed Air System <br />15480.1 <br />- Purchase <br />$5,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$5,000.00 <br />15460.2 <br />- Install <br />$1,500.00 <br />$0.00 <br />$0,00 <br />0.00 <br />$1,500.00 <br />15500 <br />HVAC <br />15500.1 <br />Equipment <br />$286,200.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$286,200.00 <br />15500.2 <br />Labor <br />$169,020.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$169,020.00 <br />15500.3 <br />Duct Insulation <br />$24,780.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$24,780.00 <br />15500.4 <br />Test & Balance <br />$5,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$5,000.00 <br />15950 <br />HVAC Controls <br />$67,400.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$67,400.00 <br />16000 <br />Electrical <br />16000,1 <br />General Provisions <br />$55,000.00 <br />$0.00 <br />$5,000.00 <br />$5,000.00 <br />9.09 <br />$50,000.00 <br />16000.2 <br />Basic Materials and Methods <br />$265,000.00 <br />$0.00 <br />$0.00 <br />0,00 <br />$265,000,00 <br />16000.3 <br />Motors <br />$32,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$32,000.00 <br />16000.4 <br />Power Generation System <br />$414,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$414,000.00 <br />16000.5 <br />Electrical Distribution <br />$385,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$385,000.00 <br />16000.6 <br />Lighting <br />$85,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$85,000.00 <br />16000.7 <br />Special Systems <br />$24,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$24,000.00 <br />16000.8 <br />Starters and Motor Control <br />$330,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$330,000.00 <br />16000.9 <br />Instrumentation and Control <br />$480,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$480,000.00 <br />$16,525,200.00 <br />$1,296,100.04 <br />$288,171.56 <br />$303,875.00 <br />$1,888,146.60 <br />11.43 <br />$14,637,053.40 <br />EJUDU A0. U -62U (7,UUA EdttUM) <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. <br />Page 6 of 6 <br />