Laserfiche WebLink
• <br /> Athletic Field Section: <br /> Orono Softball Complex 1 Rest Room $ 50,000 <br /> Oak Knoll Combination Shelter/ <br /> Concessions/Restroom in center 100,000 <br /> Cass Fields 4 -Lighted Fields 180,000 <br /> 1 - Combination Shelter/ <br /> Concessions/Restroom 125,000 <br /> 1 - Open Shelter 25,000 <br /> Phase II for Cass Fields 100,000 <br /> Total This Section $580,000 <br /> Trails Section: <br /> Rail Road Trail 4.5 miles $200,000 • <br /> 169 to Proctor Link 1.0 mile 70,000 <br /> Country Crossing I 'A mile 15,000 <br /> Oak Knoll 1/2 mile 25,000 <br /> Woodland Trails 2.0 miles 125,000 <br /> Highway 10 1.5 miles 75,000 <br /> Babcock Park to Downtown 50,000 <br /> Total This Section $ 560,000 <br /> Engineer& Design $ 73,000 <br /> GRAND TOTAL $2,000,000 <br /> • <br />