My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.a. ERMU 01-13-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
01-13-2015
>
6.1.a. ERMU 01-13-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2015 12:27:48 PM
Creation date
1/13/2015 12:27:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/13/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The MMPA Board of Directors met on December 16, 2014. At the meeting, the Board <br /> reviewed the featuring of its Hometown BioEnergy facility on the cover of POWER <br /> Magazine's December 2014 as a Top Renewable Plant award winner for 2014. The <br /> award recognizes MMPA's innovation, community focus, and support for renewable <br /> energy. The Board also discussed the completion of the Agency's purchase of a six mile <br /> transmission line in Anoka. <br /> • Interviews for the Purchasing Specialist position may be held as early as the week of <br /> January 19. The Assistant Electrical Superintendent position approved with the 2015 <br /> budget was posted internally on January 5. The internal promotion related with this <br /> Assistant position will likely result in cascading effect creating a vacant apprentice <br /> lineworker position. This was intentional and the vacant apprentice lineworker was not <br /> budgeted to be backfilled in 2015. Separate from the Assistant position generated <br /> vacancy, there is another vacant lineworker position that has been open since Ed Zurn left <br /> ERMU in late 2014. This position is still in the 2015 budget but management has <br /> decided to wait until closer to construction season in 2015 before posting the opening. <br /> ATTACHMENTS: <br /> • 2015 MMUA Legislative Conference Brochure <br /> r rYowERED BY <br /> Page 2 of 2 <br /> INATUPE <br /> Reliable Public <br /> Power Provider P O W E R E D To S E R V E <br /> 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.