My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.4. ERMUSR 01-13-15
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
01-13-2015
>
2.4. ERMUSR 01-13-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2015 11:57:09 AM
Creation date
1/13/2015 11:57:08 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/13/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br /> Energy Management Rates <br /> Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br /> Applicable: To single family residences, non-demand and demand customers receiving service <br /> under another rate, who add a second meter for any of the following controlled loads: <br /> Dual Fuel Space Heating Rate: This Program is available to residential customers only. A <br /> dual fuel space heating system consists of a primary electric heating system and a secondary <br /> non-electric space heating system both capable of heating a structure at design conditions. <br /> Interruptions of the primary system will usually occur for up to 12 hours daily on peak winter <br /> days and a maximum of 400 hours per heating season. <br /> To qualify for the special rate, the customer shall provide: <br /> 1. A primary electric space heating system which can be interrupted by a single 5 amp rated <br /> relay. <br /> 2. A secondary non-electric space heating system capable of automatic start-up and <br /> continuous operation upon interruption of the primary system. <br /> 3. Obtain a load control device furnished by ERMU. <br /> 4. Accommodations for a meter and load control device and associated wiring installed <br /> according to the applicable electrical codes, and installed by a qualified electrician. <br /> 5. Inspection by a State certified electrical inspector and a representative of ERMU. <br /> 6. Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage. <br /> 7. Exceptions by management approval only. <br /> Elk River Municipal Utilities shall provide: <br /> 1. All electric energy consumed by the primary electric heating system at$.0585 per kWh. <br /> 2. During peak load conditions, ERMU will turn customer controlled electrical heat off for <br /> extended periods of time as stated above. <br /> 3. A meter to measure electricity consumed by the primary electric heating system. <br /> 4. A load control device and meter socket to accommodate the meter. <br /> Electric Vehicle Charging Rate: This Program is available to all customers of ERMU that own <br /> an electrically powered vehicle used for on road transportation. Charging of the vehicle may be <br /> interrupted up to 12 hours per day not to exceed 400 hours in a year. <br /> To qualify for the special rate, the customer shall provide: <br /> 1. Electric vehicle charging station that is used for the sole purpose of charging electric <br /> vehicles. This charging station may be 120/240 volt. <br /> 2. Customer is responsible for installation of load control device and meter socket is <br /> furnished by ERMU in a mutually agreed upon location. <br /> 3. Inspection by State Certified electrical inspector of all metering equipment and provide an <br /> affidavit to ERMU when completed. <br /> Elk River Municipal Utilities shall provide: <br /> 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.