Laserfiche WebLink
Page 2 <br />October 18,2001 <br /> <br />new tank including connections to existing leachate piping for cell 11 and the Ioadout facilities <br />should be provided with the construction plans. <br /> <br />Landfill Gas System - There are at least six LFG extraction wells within the fill limits of cell <br />DC-3. The engineering design report indicates that the wells will be extended vertically as the <br />filling progresses. Demolition wastes must be placed carefully to ensure that the wells are not <br />damaged. <br /> <br />I reviewed the CUP for items that might warrant change. If the council authorizes the requested <br />amendment, the language in section 2.) (03) (b) should be modified. The reference should.be <br />changed to read: "The demolition debris landfill cell DC-3 shall be located and operated as <br />shown on the June 2001 Permit Application and August 2001 revisions submitted by the <br />Permitee and reviewed by City Staff." I did not see the need to change any of the other specific <br />conditions in the CUP. Other issues for WMI and the landfill can be addressed within the <br />existing framework of the CUP and License. <br /> <br />Please contact me if you have additional questions or comments. My direct dial phone number <br />at ERG is 612-339-2316. Thank you. <br /> <br />Sincerely, <br /> <br />Matthew L. Ledvina, P.E. <br />Project Manager <br /> <br />Cc: Dave Lucas, Sherburne County Zoning <br /> <br />G:\Clients\Client A-L\City of Elk RiveACER2000-020\Corr\Letters 2001\1t011018.doc <br /> <br /> <br />