My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 11-19-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
11/19/2001
>
6.1. SR 11-19-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:30 AM
Creation date
4/28/2004 7:37:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/19/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ty ~ <br /> <br />MEMORANDUM <br /> <br />Item ~ 6.1. <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: <br />DATE: <br /> <br />Steve Rohlf, Building and Zoning Administrator <br />November 19, 2001 <br /> <br />SUBJECT: <br /> <br />Modification to Elk River Landfill's Conditional Use Permit and <br />Solid Waste License to Authorize a New Demolition Disposal <br />Area and an Encroachment into an Existing Buffer Area/P.H. <br />Case # CU 01-35 <br /> <br />Request <br />The Elk River Landfill is requesting a modification to their existing conditional use permit <br />(CUP) and solid waste facility license (most recent renewal of both was May, 2000) to allow <br />them to dispose of demolition debris over the top of an existing mixed municipal solid waste <br />(MSW) cell. This request necessitates a modification to their grading plan in the area of the <br />proposed demolition debris cell. The modification includes changing the existing 5 to 1 <br />slopes in this area to 3 to 1 slopes, which is consistent with the slopes to the south of the <br />proposed demolition cell and encroaching on the buffer area adjacent to the City's Railroad <br />Hiking Trail. The additional encroachment is due to the slopes and berms associated with <br />the proposed demolition cell. The actual demolition debris will not be deposited any further <br />into the buffer area than where the MSW is currently located. The property affected by this <br />request is already zoned Solid Waste Facility Overlay District. <br /> <br />Attachments <br /> ~ A vicinity map showing the location o£ the Elk River Landfill <br /> ~ A letter dated October 18, 2001, from Matt Ledvina, Environmental consultant for <br /> the City of Elk River. <br /> ~ The current Landfill CU.? (the Landfill's Solid Waste Facility License was not <br /> provided because the language is the same as the CUP). <br /> ~ The following submittals from the Elk River Landfill: <br /> · A written explanation of their request provided by the Elk River Landfill, <br /> dated October 16, 2001. <br /> · Final Cover Grades and surface Water Management, dated January, 2000, <br /> which shows the currently approved contours. <br /> · Final Cover Grades, dated June 2001, which shows the proposed contours. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.