My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 12-15-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
12-15-2014
>
8.1. SR 12-15-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2014 10:04:05 AM
Creation date
12/12/2014 9:59:56 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2015 thr, 2019 <br /> City of Elk River, Minnesota <br /> Project# STM-1 <br /> Project name Storm Water projects <br /> Type Maintenance Department Engineering <br /> Useful Life Unassigned Contact Engineer <br /> Category Maintenance projects Priority n/a <br /> Description <br /> Annual pond cleaning,stormsewer repairs,BMW inventory. <br /> 2015 includes a 6"high volume water pump. <br /> Storm Sewer infrastructure projects combined with street projects are included on the pavement management CIP sheet. <br /> Justification <br /> These annual projects include the testing,removal,and disposal of sediment deposits from our stormwater ponds. This is needed to assure these <br /> devices are functioning as designed and achieving the water quality standards of our NPDES permit. <br /> The smaller stormsewer repairs include minor pipe upsizing,culvert replacement,manhole and catch basin repairs and fixing of washout areas. <br /> A 6"high volume water pump and piping is needed to supplement the ability of our stormsewer system to drain isolated low areas that are prone <br /> to excessive standing water and flooding. The age and condition of our system,combined with the excessive rainfall experienced over the last <br /> three seasons has highlighted the need for this equipment. <br /> Expenditures 2015 2016 2017 2018 2019 Total <br /> Con struction/Maintena nee 210,000 210,000 210,000 210,000 660,000 1,500,000 <br /> Equipment 30,000 30,000 <br /> Total 240,000 210,000 210,000 210,000 660,000 1,530,000 <br /> Funding Sources 2015 2016 2017 2018 2019 Total <br /> Storm Sewer 240,000 210,000 210,000 210,000 660,000 1,530,000 <br /> Total 240,000 210,000 210,000 210,000 660,000 1,530,000 <br /> 2015-2019 CAPITAL IMPROVEMENT PLAN Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.