Laserfiche WebLink
Capital Improvement Plan 2015 thr, 2019 <br /> City of Elk River, Minnesota <br /> Project# STM-1 <br /> Project name Storm Water projects <br /> Type Maintenance Department Engineering <br /> Useful Life Unassigned Contact Engineer <br /> Category Maintenance projects Priority n/a <br /> Description <br /> Annual pond cleaning,stormsewer repairs,BMW inventory. <br /> 2015 includes a 6"high volume water pump. <br /> Storm Sewer infrastructure projects combined with street projects are included on the pavement management CIP sheet. <br /> Justification <br /> These annual projects include the testing,removal,and disposal of sediment deposits from our stormwater ponds. This is needed to assure these <br /> devices are functioning as designed and achieving the water quality standards of our NPDES permit. <br /> The smaller stormsewer repairs include minor pipe upsizing,culvert replacement,manhole and catch basin repairs and fixing of washout areas. <br /> A 6"high volume water pump and piping is needed to supplement the ability of our stormsewer system to drain isolated low areas that are prone <br /> to excessive standing water and flooding. The age and condition of our system,combined with the excessive rainfall experienced over the last <br /> three seasons has highlighted the need for this equipment. <br /> Expenditures 2015 2016 2017 2018 2019 Total <br /> Con struction/Maintena nee 210,000 210,000 210,000 210,000 660,000 1,500,000 <br /> Equipment 30,000 30,000 <br /> Total 240,000 210,000 210,000 210,000 660,000 1,530,000 <br /> Funding Sources 2015 2016 2017 2018 2019 Total <br /> Storm Sewer 240,000 210,000 210,000 210,000 660,000 1,530,000 <br /> Total 240,000 210,000 210,000 210,000 660,000 1,530,000 <br /> 2015-2019 CAPITAL IMPROVEMENT PLAN Page 8 <br />