My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 12-15-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
12-15-2014
>
8.2. SR 12-15-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2014 9:58:37 AM
Creation date
12/12/2014 9:57:43 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. All engineering staff salaries and benefits are in the General Fund with a chargeback to the project <br /> funds for project specific work. Revenue offset is included and this will match the 2015 budget <br /> and streamline timekeeping and tracking. <br /> Revenue amendments are proposed for the following items. <br /> 1. Charges for services are updated to reflect engineering services reimbursement and other <br /> miscellaneous adjustments. <br /> 2. Fireworks contributions. <br /> 3. Building permit revenue is reallocated to the new construction permits received versus remodel <br /> projects which would be more plumbing/heating versus plan check fees and building permits. <br /> Ice Arena: <br /> Capital outlay is adjusted to reflect improvement projects that will be completed after the facility plan is <br /> done. <br /> Library: <br /> Building repair and maintenance services line item is adjusted to reflect council approval on 08/04/2014 <br /> for the landscape project on the Library grounds. <br /> Wastewater <br /> Budget is adjusted to reflect bond proceeds and the timing of the State Grant reimbursement and the <br /> Transfer in which have both been moved to the 2015 budget due to timing of project expenditures. <br /> Pinewood operating transfer will be adjusted based on the actual required amounts,which will be <br /> determined at year-end. <br /> Financial Impact <br /> General Fund remains balanced for 2014. <br /> Attachments <br /> ■ 2014 Budget Amendment Summary <br /> N:\Public Bodies\Agenda Packets\12-15-2014\Final\x8.2 sr 2014 budget amendments.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.