Laserfiche WebLink
incurring liquidated damages on November 8`h. I will give an update at the commission <br /> meeting. <br /> • The contractor working on Natures Edge Business Park Phase 2 has completed installing <br /> the watermain but has not pressure tested the main or had it tested for bacteria yet. <br /> • Mike Langer and Pete Neilsen cleaned out and reformed the drainage swale at Well#6. <br /> • Angela Hauge has been working with Christy Schallock and Jennie Nelson, to identify <br /> and repair all of the stopped and non-reading water meters. This involves Christy going <br /> through the entire high/low report, and the zero use report,to identify the water meters <br /> that need attention. Angela then contacts the homeowners so she can gain access to the <br /> water meter for repairs. <br /> • I went out and hand delivered private hydrant letters and policies to all of the businesses <br /> that have not yet signed up for the private hydrant maintenance program. Since delivering <br /> the letters, we've had 10 more businesses sign up for the program; adding 22 private <br /> hydrants that will receive annual preventative maintenance. The 2015 program will <br /> service 158 private hydrants for 66 separate businesses. <br /> • Attended the Minnesota Municipal Utilities Association(MMUA) Firstline Supervision <br /> Program October 8-10 at Central Lakes College in Brainerd, MN. The education report <br /> is attached. <br /> ATTCHMENTS: <br /> • October Pumping By Well <br /> • Pictures of Well#3 Effluent Pipe Replacement <br /> • Eric Volk Education Report <br /> Wiae►. POWERED Dr <br /> ■Lr$ Page 2 of 2 NATURE <br /> Reliable Public <br /> Power Provider P OWE RED T O S E 0.V E <br /> 136 <br />