Laserfiche WebLink
Elk River Municipal Utilities <br /> 2015 Utilities Fee Schedule <br /> Adopted by the Utilities Commission on October 21,2014 under authority per Minnesota Statute 412.361 <br /> Fee Description 2015 <br /> 1 New Residential Electric Connection-Developer-Lot with ERMU water service $ 475.00 <br /> 2 New Residential Electric Connection-Developer-Lot without ERMU water service $ 575.00 <br /> 3 New Residential Electric Connection-Builder $ 875.00 <br /> 4 New Service Frost Trenching(per foot) $ 5.00 <br /> 5 New Commercial&Industrial Electric Connection 50% <br /> 6 Service Upgrades or Additions for Existing Customers 100% <br /> 7 Minimum Temporary Electric Service Fee-Existing Transformer $ 150.00 <br /> 8 Minimum Temporary Electric Service Fee-Without Existing Transformer $ 500.00 <br /> 9 Street Light-30'Decorative Pole with 6'Arm and Fixture $ 1,850.00 <br /> 10 Street Light-23'Decorative Pole with Traditionaire Fixture $ 1,500.00 <br /> 11 Security Light-Wood Pole with Fixture $ 975.00 <br /> 12 Security Light-Existing Pole $ 125.00 <br /> 13 Pole Attachment Fee(per pole) $ 6.50 <br /> 14 <br /> 15 Water Access Charge=Water Connection Charge+Water Availability Charge $ 3,325.00 <br /> 16 Water Connection Charge(Per Plumbing Unit)-Builder $ 3,000.00 <br /> 17 Water Availability Charge(Per Plumbing Unit)-Developer $ 325.00 <br /> 18 Abandoned Water Service $ 2,500.00 <br /> 19 Hydrant Water Sales-Rental(per week) $50/week <br /> 20 Hydrant Water Sales-Units(per 1000 gallons) $ 4.00 <br /> 21 Deposit for 5/8"Hydrant Meter $ 150.00 <br /> 22 Deposit for 2 1/2"Hydrant Meter $ 1,000.00 <br /> 23 Private Hydrant Maintenance Program Monthly Fee $ 5.00 <br /> 24 <br /> 25 NSF Fee $ 30.00 <br /> 26 Red Tag Handling Fee $ 20.00 <br /> 27 Administrative Fee for Continued Submission of Checks After No-Check Notice Given $ 20.00 <br /> 28 Penalty Amount 10% <br /> 29 Electric Service Disconnect Fee-Meter Technician $ 50.00 <br /> 30 Electric Service Disconnect Fee-Line Crew $ 150.00 <br /> 31 Water Shut-Off Fee $ 100.00 <br /> 32 Meter Tampering Fee $ 250.00 <br /> 33 Meter Testing Fee $ 50.00 <br /> 34 Energy Audit $ 50.00 <br /> 35 <br /> 36 Billable Cost of Materials Markup 15% <br /> 37 Billable Labor Markup 55% <br /> 38 Billable Vehicle/Equipment(per employee per hour) $ 30.00 <br /> 39 <br /> 40 <br />