Laserfiche WebLink
■ 74 -102 'W inter Parking Ban (allowed 21 days to pay ticket) <br />• Second notice with late payment charge (allowed 14 <br />additional days to pay) <br />• If both notices are ignored, a formal complaint is filed in <br />district court <br />PARKING PERMITS (foremployees) <br />POLICE RESERVE SERVICE <br />OFP F)U_ry OFFICER SERVICE <br />SECURITY ALARMS <br />■ Permit <br />■ False Alarms <br />$20 <br />$40 <br />$90 <br />$20 /per year <br />$28/ hr <br />S 15/1ir <br />$20 <br />Alarm 1 -2 — No charge <br />Alarm 3 -5 - $50 <br />Alarm 6 -7 - $100 <br />Alarm 8 -9 - $250 <br />10 & Over - $500 <br />Failure to obtain alarm permit - $100 <br />Other civil. alarm violations - $100 <br />ELECTRIC CONNECTION <br />■ Non - Residential Developer <br />o Lot with ERMU water service <br />a Lot without ERMU water service <br />■ Builder <br />■ Commercial & Industrial <br />■ Existing Services Upgrade <br />■ New Sen-ice Frost Trenching <br />■ Mnimutn Temporary Electric Service Fee with Transformer <br />■ INlinimum Temporary Electric Service Fee without Transformer <br />■ Street Light — 30' Decorative Pole w 6' Arm & Fixture <br />■ Street Light — 23' Decorative Pole w Traditional Fixture <br />■ Security Light — Wood Pole w Fixture <br />■ Security Light — Existing Pole <br />■ Pole Attachment Fee (per pole) <br />DISCONNECT FEE <br />■ Electrical - Residential <br />■ Electrical - 3 Phase <br />■ Water Shut -Off <br />METER TAMPERING <br />METER TESTING <br />3 $475 <br />S575 <br />S8_ S875 <br />50% of the cost of installation <br />100 % of cost of installation <br />S5 per foot <br />$150 <br />$500 <br />$1,850 <br />$1,500 <br />$9-59 $975 <br />$400 S125 <br />$6.50 <br />$50 <br />$150 <br />$100 <br />$250 <br />