My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 12-01-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
12-01-2014
>
8.1. SR 12-01-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2014 3:05:53 PM
Creation date
11/26/2014 9:47:28 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/1/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 5.4 Signature Park Con <br />Additional parking for park /rinksu <br />Relocated Ice Arena <br />Upgraded Outdoor Rink <br />Remove sledding hill <br />Lion John Weicht Park <br />7 <br />Remove path <br />Connect to Schools <br />f <br />Relocate and <br />redesign <br />amphitheater/ <br />stage space <br />with open sight <br />lines and lake <br />backdrop <br />Trail Loops' Stormwater Featur <br />reate forebay to reduce <br />ediment buildup in main lake <br />,ea and improve water quality <br />Better deft ne wet /dry edges <br />i Art Walk <br />1 <br />Y <br />M1 ti I <br />rl �� <br />I <br />W1119 <br />i <br />Expand playground in <br />partnership with Boys & Girls +� <br />Club " <br />future <br />Lion John Weicht Park <br />Lion John Weicht Park will improve the functioning of the water features in the park. Creating a forebay will improve <br />water quality and decrease dredging needs in the larger lake. Improved wetlands will improve habitat and water quality. <br />By better shaping these features the dry portions of the park can be improved as well, creating uplands and wetlands, <br />rather than just having soggy areas. Improved trail loops will connect the park to schools and future development. An <br />"art walk" displaying sculpture and other art would work well as an upgrade to this park. The amphitheater will be <br />relocated and redesigned as an open stage to take advantage of views of the water. <br />If the arena is relocated to Lion John Weicht Park, it should be located in the northwest corner. The road connection <br />from Lions Park Drive and 6th Street NW will improve access and better define the two uses of the park. Depending <br />the footprint and desired programming of the building, the sledding hill may need to be modified or removed. <br />Draft 11.25.1 4 Chapter 5: How We Get There 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.