My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3. SR 11-17-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
11-17-2014
>
8.3. SR 11-17-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2014 9:31:30 AM
Creation date
11/14/2014 9:20:13 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• BOL-TON 8& MEa N K , INC® <br /> Consulting Engineers & Surveyors <br /> " 2035 County Road D East•Suite B• Maplewood, MN 55109-5314 <br /> Phone (651) 704-9970• Fax(651)704-9971 <br /> www.bolton-menk.com <br /> MEMORANDUM <br /> Date: November 6, 2014 <br /> To: Justin Femrite,P.E., City Engineer <br /> From: Cody Holmes, P.E.,Project Manager <br /> Mark D. Kasma,P.E., Senior Principal Engineer <br /> Subject: 165th Avenue NW&Jarvis Street NW <br /> City of Elk River <br /> BMI Project No.N15.108340 <br /> This memo summarizes the additional time our Team utilized to complete the two(2) additional <br /> preliminary designs,revised cost estimates and cost sharing splits with the City of Ramsey. It involves <br /> four(4)key Team members and myself. The following is our summary: <br /> Oversight, Cost Estimating and Report Revisions <br /> • Cody Holmes-46.5 hours at$108 <br /> • Gary Garr-7 hours at$136 <br /> Preliminary Layouts and Quantities <br /> • Dan Thill- 191 hours at$129 <br /> Stormwater&Ponding <br /> • Tim Olson-29 hours at$115 <br /> • Sara Race- 36 hours at$88 <br /> The total additional fee request is $37,116. The Team is ready to complete final plans and specifications <br /> over the next 4-6 weeks. Please let me know if you need anything else from me regarding this additional <br /> work. <br /> DESIGNING FOR A BETTER TOMORROW <br /> Bolton&Menk is an equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.