Laserfiche WebLink
Bid Schedule <br /> 11/12/14 <br /> Stormwater Pond Dredgiflg <br /> fr p DSCt1IQII �Ilttr tllttLCe Tt7c`T <br /> r <br /> Temporary and Permanent Turf 1-LS $ 33,235.00 33,235.00 <br /> Restoration <br /> Pond Excavation SRV Level 2 1957-CY $ 53.25 104,210.25 <br /> Orono and Highland/Jackson <br /> Total Bid $137,445.25 <br /> Frattalone Companies,Inc.acknowledges addendum#1 on November 7,2014. <br />