Laserfiche WebLink
VIII. <br /> <br />The existing parcels and corresponding property identification numbers for the <br />benefiting properties are shown on Exhibits 2 through 7. <br /> <br />PROJECT SCHEDULE <br /> <br />The following project schedule for the 2004 Overlay Improvement Project is <br />based upon guidelines in Minnesota Sate Statues Chapter 429 for assessment of <br />local improvements: <br /> <br />Order Feasibility Study <br /> <br />February 2004 <br /> <br />Receive Feasibility Study, Order Public Hearing, Determine <br />Cost to be Assessed/Order Assessment Hearing <br /> <br />April 2004 <br /> <br />Hold Public Hearing/Assessment Hearing <br />Order Plans and Specifications, Authorize Advertisement <br />for Bids <br /> <br />June 2004 <br /> <br />Open Bids, Award Contract <br /> <br />June 2004 <br /> <br />Begin Construction <br /> <br />June 2004 <br /> <br />IX. <br /> <br />Complete Construction <br /> <br />August 2004 <br /> <br />CONCLUSION <br /> <br />Based on the information gathered and the analyses presented, the proposed <br />overlay improvements are feasible from an engineering standpoint and would <br />meet all standards set forth by the City. The proposed project would increase the <br />total life of the existing bituminous roads and improve the condition of the roads. <br /> <br />4 <br /> <br /> <br />