My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 11-03-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
11-03-2014
>
7.1. SR 11-03-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2014 12:22:45 PM
Creation date
10/31/2014 12:10:15 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/3/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> CONDITIONS OF APPROVAL <br /> 1. Surface Water Management Fee at the rate applicable at the time of Final Plat <br /> approval. <br /> 2. All appropriate grading permits must be obtained prior to commencing work <br /> on the site. <br /> 3. Grading and Erosion Control plan be submitted and approved by the city <br /> engineer prior to the issuance of building permits. <br /> 4. Water Availability Charge be paid prior to releasing the plat for recording. <br /> 5. Any item or condition found that indicates the site is likely to yield information <br /> important to pre-history or history shall be reported to the city immediately. <br /> Further, the city reserves the right to stop work authorized in its approval until <br /> the site is appropriately investigated and work is authorized. <br /> 6. Service Connection Plan approved by city engineer. <br /> 7. The applicant will work with staff on developing a landscape plan and <br /> foundation planting that provides for 25 new trees that meet ordinance <br /> requirements. <br /> P O W E R E D 0 Y <br /> 1`4 f U <br />
The URL can be used to link to this page
Your browser does not support the video tag.