My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1a. ERMUSR 10-21-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
10-21-2014
>
6.1a. ERMUSR 10-21-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2014 9:50:45 AM
Creation date
10/20/2014 3:41:22 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities <br />13069 Orono Parkway e P.O. Box 430 <br />Elk River, MN 55330 -0430 <br />The City of Elk River <br />Attn: Mr. Cal Portner — City Administrator <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />,vww. elkriv eru till ties. corn <br />October 13, 2014 <br />Subject: Request for Approval of Trunk Utility Funding for Filter Plant Project Engineering. <br />Mr. Portner, <br />Elk River Municipal Utilities requests funding from available water trunk utility finds for the <br />engineering of a new Well #9 Water Filtration Plant be included for Council approval in the <br />City's 2015 Capital Improvement Plan. The engineering has been estimate at $60,000. <br />In 2012 ERMU began implementing a water distribution system upgrade to more efficiently <br />utilize the capacity of our current wells and improve water distribution to the southeastern area of <br />the urban service area. Specifically, the improvements are designed to provide additional water <br />capacity to the new Natures Edge Business Park area. For the first phase of this project the <br />Council approved the use of water trunk funds for a water main improvement project that <br />rerouted water from Well #8 to connect with the water distribution system at Well #9 located on <br />Twin Lakes Parkway. This project then rerouted the water output from Well #9 to the Well #7 <br />Filtration Plant located on Twin Lakes Road. <br />In 2013 the Council approved the use of water trunk funds for the second phase of this project for <br />a 2014 water main improvements project that will add over 2,700 additional feet of water main on <br />Twin Lakes Road from the Well 47 Filtration Plant to County Road 12. This project is currently <br />under construction. <br />The final phase of this project is to construct the Well #9 Filtration Plant adjoined to the Well #7 <br />Filtration Plant. This project is projected for construction in 2016 with the engineering to be <br />completed in 2015. The funding for the filtration plant addition will likely be through the <br />issuance of bonds in 2016. ERMU would like to utilize water trunk utility funds to pay for the <br />2015 engineering costs. This project is proposed as part of the 2015 ERMU capital budget and <br />will be presented for final approval in December by the Utilities Commission contingent upon <br />City Council approval of the use of trunk funds. <br />Best Regards: <br />Troy Adams, P.E. <br />General Manager <br />Cc: Eric Volk — Water Superintendent <br />Justin Femrite, P.E. — City Engineer <br />j_j Tim Simon — City Financial Director P O W E R E D D M <br />Reliable Public INATUR <br />Power Provider P O W E R E D To S E R V E <br />113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.