My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMUSR 10-21-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
10-21-2014
>
5.4. ERMUSR 10-21-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2014 9:49:41 AM
Creation date
10/20/2014 3:33:37 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
their 2015 wholesale power rates, however early indications are that GRE will have an <br />increase just over 3 %. Typically, there is some adjustment of the rate structure and that <br />may impact us more than that. The final GRE board approval of wholesale power rates <br />usually comes by early December. For preliminary budgeting, the attached expense <br />budget reflects a 4% increase in wholesale power costs. This increase includes growth <br />and wholesale power cost increases. This may need to be adjusted prior to final budget <br />approval. <br />Similar to the water expense budget, this draft does not reflect any increase in ERMU <br />electric rates. Without any electric rate increase, the electric department would see a <br />$320,808 or 1% margin. In the recent past we have designed for a 1.5% margin. The <br />rate design will be completed for the November meeting. <br />The following are recommended discussion points for the Commission. <br />WWa es — The water and electric budgets currently reflect a 3% wage increase as typically <br />done for preliminary budgeting. Early indications are that cost of living adjustments will <br />likely be below 3 %; however, these evaluations have not been completed by the Wage <br />and Benefits Committee yet. The Committee will be bringing back a COLA <br />recommendation as well as any market adjustment recommendations for positions or pay <br />groups for Commission consideration at the November Commission meeting. <br />2. Staff Additions — Staff proposed the consideration of the addition of 2 staff positions: an <br />entry level Field Engineer and a Key Accounts Specialist and these have been included in <br />the expenses, with the intention of hiring the Engineer mid -year and the Specialist at the <br />beginning of 2015. The mid -year addition of an entry level Field Engineer would be <br />offset by the elimination of $30,000 in directly related engineering consulting expense <br />that has been in the budget in previous years. This is another case of offsetting the <br />expense related to outsourced work and bring the work in- house. Also included is a part- <br />time cleaning position or contracted cleaning employee which would be starting at the <br />beginning of 2015. With the retirement of the current Technical Services Superintendent <br />we would hire the replacement early in 2015 to allow for an overlap in training. <br />3. Software Conversion — The NISC software conversion will happen in the first quarter of <br />2015, and we have budgeted expenses for software support for the entire year. As with <br />the ABS conversion estimates, there are some additional expenses included for staff <br />training time related to the conversion. <br />ATTACHMENTS: <br />• Proposed 2015 Electric Expense Budget <br />• Proposed 2015 Water Expense Budget <br />Reliable Public <br />Power Provider <br />Page 2 of 2 <br />67 <br />N"" W E R E D 0 Y <br />ATURg <br />P O W E R E D To S E R V E <br />
The URL can be used to link to this page
Your browser does not support the video tag.