Laserfiche WebLink
65 <br />Elk River Municipal Utilities <br />2015 Utilities Fee Schedule <br />Proposed Revisions <br />Fee Description <br />2014 <br />Proposed <br />2015 <br />Proposed <br />Increase <br />1 <br />New Residential Electric Connection - Developer - Lot with ERMU water service <br />$ 450.00 <br />$ 475.00 <br />5.56% <br />2 <br />New Residential Electric Connection - Developer - Lot without ERMU water service <br />$ 550.00 <br />$ 575.00 <br />4.55% <br />3 <br />New Residential Electric Connection - Builder <br />$ 850.00 <br />$ 875.00 <br />2.94% <br />4 <br />New Service Frost Trenching (per foot) <br />$ 5.00 <br />NEW <br />5 <br />New Commercial & Industrial Electric Connection <br />50% <br />50% <br />6 <br />Service Upgrades or Additions for Existing Customers <br />100% <br />100% <br />7 <br />Minimum Temporary Electric Service Fee - Existing Transformer <br />$ 150.00 <br />$ 150.00 <br />8 <br />Minimum Temporary Electric Service Fee - Without Existing Transformer <br />$ 500.00 <br />$ 500.00 <br />9 <br />Street Light - 30' Decorative Pole with 6' Arm and Fixture <br />$ 1,800.00 <br />$ 1,850.00 <br />2.78% <br />10 <br />Street Light - 23' Decorative Pole with Traditionaire Fixture <br />$ 1,450.00 <br />$ 1,500.00 <br />3.45% <br />11 <br />Security Light - Wood Pole with Fixture <br />$ 950.00 <br />$ 975.00 <br />2.63% <br />12 <br />Security Light - Existing Pole <br />$ 100.00 <br />$ 125.00 <br />25.00% <br />13 <br />Pole Attachment Fee (per pole) <br />$ 6.50 <br />$ 6.50 <br />14 <br />15 <br />Water Access Charge = Water Connection Charge + Water Availability Charge <br />$ 3,214.84 <br />$ 3,325.00 <br />3.43% <br />16 <br />Water Connection Charge (Per Plumbing Unit) - Builder <br />$ 2,914.84 <br />$ 3,000.00 <br />2.92% <br />17 <br />Water Availability Charge (Per Plumbing Unit) - Developer <br />$ 300.00 <br />$ 325.00 <br />8.33% <br />18 <br />Abandoned Water Service <br />$ 2,500.00 <br />$ 2,500.00 <br />19 <br />Hydrant Water Sales - Rental (per week) <br />$50 /week <br />$50 /week <br />20 <br />Hydrant Water Sales - Units (per 1000 gallons) <br />$ 4.00 <br />$ 4.00 <br />21 <br />Deposit for 5/8" Hydrant Meter <br />$ 150.00 <br />$ 150.00 <br />22 <br />Deposit for 2 1/2" Hydrant Meter <br />$ 1,000.00 <br />$ 1,000.00 <br />23 <br />Private Hydrant Maintenance Program Monthly Fee <br />$ 5.00 <br />$ 5.00 <br />24 <br />25 <br />NSF Fee <br />$ 30.00 <br />$ 30.00 <br />26 <br />Red Tag Handling Fee <br />$ 20.00 <br />$ 20.00 <br />27 <br />Administrative Fee for Continued Submission of Checks After No -Check Notice Given <br />$ 20.00 <br />$ 20.00 <br />28 <br />Penalty Amount <br />10% <br />10% <br />29 <br />Electric Service Disconnect Fee - Meter Technician <br />$ 50.00 <br />$ 50.00 <br />30 <br />Electric Service Disconnect Fee - Line Crew <br />$ 150.00 <br />$ 150.00 <br />31 <br />Water Shut -Off Fee <br />$ 100.00 <br />$ 100.00 <br />32 <br />Meter Tampering Fee <br />$ 250.00 <br />$ 250.00 <br />33 <br />Meter Testing Fee <br />$ 50.00 <br />$ 50.00 <br />34 <br />Energy Audit <br />$ 50.00 <br />$ 50.00 <br />35 <br />36 <br />Billable Cost of Materials Markup <br />15% <br />15% <br />37 <br />Billable Labor Markup <br />55% <br />55% <br />38 <br />Billable Vehicle / Equipment (per employee per hour) <br />$ 30.00 <br />NEW <br />39 <br />Billable Vehicle / Equipment - Line Truck (per hour) <br />$ 50.00 <br />40 <br />Billable Vehicle / Equipment - Pick -up Truck (per hour) <br />$ 25.00 <br />41 <br />42 <br />65 <br />