My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. SR 04-05-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
04/05/2004 - SPECIAL
>
4.0. SR 04-05-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:28 AM
Creation date
4/12/2004 7:42:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Mayor and City Council <br />April 5, 2004 <br />Page 2 <br /> <br />Also included in the total remodeling costs are additional cubicles for staff. <br /> <br />1. Wall Construction - Cost: $3,000 <br /> <br />Included in the wall construction would be installation of framing members, application <br />of sheetrock, primer, paint and labor. This component is needed to prevent access to <br />the office area after hours from the large meeting room area. <br /> <br />2. Restroom to Break room Conversion - Cost: $11,000 <br /> <br />Included in the restroom to break room conversion is the removal and capping of <br />existing plumbing fbmares, blocking in one restroom door, vinyl tile, furring the walls, <br />sheetrock, primer, paint, texturing the ceiling, and installation of two 2'x4' fluorescent <br />light fNmres. <br /> <br />3. Kitchen to Storage Conversion - Cost: $3,000 <br /> <br />Included with this portion of the project includes removing existing the serving window <br />doors and constructing solid wall space in the openings to provide a permanent secured <br /> <br />4. Storage Room Wall Removal and Office Wall Construction - Cost: $8,100 <br /> <br />Included in this cost are removing the existing wall located between the open office <br />space and storage room, constructing a wall to create a private office for the Recreation <br />Manager, installation of new carpet in that portion which was previously storage room, <br />and installation of a dropped ceiling along with five 2'x4' fluorescent light fixtures. <br /> <br />The total cost of the above projects is $25,100. This is $2,100 over the original estimate due <br />to staff calculating items such as profit and dumpster charges individually for four projects as <br />opposed to one charge for an entire project. <br /> <br />Furniture and Fixtures <br /> <br />The current proposed budget for furniture and fixtures is $20,000. The following spaces will <br />be existing and proposed, once the remodeling is done: <br /> <br />Existing Cubicles/Office Proposed Cubicles/Office <br /> <br />Recreation Manager (office) <br />Marketing Assistant <br />Customer Service (front desk) <br />Facility Coordinator <br /> <br />Director (office) <br />Marketing Assistant <br />Customer Service (front desk) <br />Facility Coordinator <br /> <br />Summer Help and Other Vendors <br />Recreation Manager (office) <br />Park Foreman <br /> <br />Senior Coordinator <br /> <br />Future Staff (vacant) <br /> <br />SAPLANNINGKMichele McPhersonMvIEMOSKLPC Remodel.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.