My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. SR 04-05-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
04/05/2004 - SPECIAL
>
3.0. SR 04-05-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:28 AM
Creation date
4/12/2004 7:41:48 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. McPherson <br />March 17, 2004 <br />Page Two <br /> <br />process of preparing a standard SWPPP for use on projects. If Sherbume County <br />desired, it would be appropriate to use the City's standard SWPP for this project. <br />Is there a setback requirement for ponding from property lines, parking lots, and <br />buildings? The proposed reconfigured drainage pond has 3:1 side slopes that begin <br />immediately adjacent to the property line on the west and parking lot and new <br />building on the east. We would strongly suggest that this is an undesirable <br />situation. <br /> <br />B. Sanitary Sewer/Watermain <br /> <br />1. There are two new proposed hydrants to be installed near the south side of the <br /> Justice Center expansion: one on the east and one on the west. The proposed <br /> hydrant on the east is situated on the south side of the new read surrounding the <br /> expansion. We would recommend that that hydrant be moved to the north side of <br /> the road. <br />2. Fire Chief indicated he thought there was an existing hydrant not shown on the <br /> plans that would be approximately just north of the building expansion on the west <br /> side. The fire department would like that hydrant relocated, or a new one placed if <br /> that hydrant does not exist, on the green space behind the sidewalk between the <br /> existing building and the expansion. <br />3. Water service and fire protection is proposed to be provided by six-inch water stub <br /> from the existing eight-inch water line along the west side of the expansion. <br />4. Sanitary sewer service is proposed to be provided into both sides, east and west, of <br /> the expansion. On the east side of the building, this is proposed to be accomplished <br /> by constructing a new sanitary sewer manhole over the existing line with a six-inch <br /> stub to the building. On the west side, there is proposed to be an eight-inch stub out <br /> of an existing manhole extended northerly to a new manhole with six-inch stubs into <br /> the west side of the Justice Center expansion and the south side of the new <br /> maintenance building. Because City Ordinance requires each individual building to <br /> have its own service, this entire line from existing sanitary sewer will have to be <br /> considered a private service. <br /> <br />If you have any questions regarding any of these issues, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br />T~.E. <br /> <br />TJM:sw <br /> <br />Ltr-031704-McPherson.doc <br /> <br />Howard R. Green Company <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.