Laserfiche WebLink
Elk River Comprehensive Plan <br /> Inventory and Analysis Great River Energy plant and has been in operation <br /> since 1977 with several upgrades since. Wastewater <br /> Sanitary Sewer improvements since 2004 include upgrades to the <br /> wastewater treatment facility in 2005, sand filter <br /> Elk River's desired future land use pattern must be upgrades in 2006, and upgrades to various lift <br /> tied closely with a cost-effective wastewater service <br /> strategy. The City must be certain in determining the stations every year. <br /> pattern of sanitary sewer interceptors, lift stations, In February 2013, a Wastewater Treatment Facility <br /> and force mains to complete its development pattern. Plan was completed to evaluate the capacity of the <br /> Moreover, the City must ensure that costs of these existing facility and the ability to reliably achieve <br /> improvements are equitably distributed and services the reduced effluent limits at design flows and loads <br /> are provided in a planned, phased sequence that and to develop a plan for future plant modifications. <br /> promotes development. As improvements to the facility are presented, the <br /> The sanitary sewer collection system in the City of City should follow the recommendations of the <br /> Elk River includes over 77 miles of lines. As a result, Wastewater Treatment Facility Plan. <br /> 21 lift stations are needed to transport sewage to The current plant has a maximum treatment capacity <br /> a wastewater treatment facility that the City of Elk of approximately 2,200,000 gallons per day. On June <br /> River owns and operates that serves the residents of 23, 2012 the highest daily flow was recorded at <br /> Elk River as well as commercial and industrial users 1,930,000 gallons. Table 8-A: Wastewater Treatment <br /> located within the community. The plant is located Facility Average Daily Flows 2006-2012 shows the <br /> between Highway 169 and the rail line, north of the changes in annual daily flow since 2006. <br /> Table 8-A: Wastewater Treatment Facility Average Daily Flows 2006-2012 <br /> 1,260,000 <br /> 1,240,000 <br /> c 1,220,000 – <br /> 1,200,000 <br /> o 1,180,000 <br /> ,` 1,160,000 - — — <br /> 1,140,000 - — — <br /> 1,120,000 - — — <br /> a I <br /> 1,100,000 - — — <br /> 1,080,000 — <br /> 2006 2007 2008 2009 2010 2011 2012 <br /> Gallons 1,142,428 1,183,29411,211,12011,243,078' 1,188,985' 1,193,98011,171,000 <br /> 90 / Chapter 8: Utilities <br />