My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 10-06-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
10-06-2014
>
4.5. SR 10-06-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2014 11:00:21 AM
Creation date
10/2/2014 10:24:10 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/6/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*tj 11'Elk River Comprehensive Plan <br /> of existing collector or arterial roadways or include <br /> construction of new routes as development <br /> occurs. Much of this proposed collector network <br /> was identified as part of the US 10, US 169, the <br /> Mississippi Connections Redevelopment Framework, <br /> and 171st Avenue Focused Area studies. <br /> Traffic Diversion and Continuous Implementation <br /> Routes (arterials and collectors) In order to implement changes that require <br /> construction of new routes or segments of routes, it <br /> The lack of continuous north-south and east-west is recommended that proactive efforts be undertaken <br /> collector and arterial routes creates connectivity by the City in order to preserve the right of way that <br /> problems and results in congestion on the limited is needed rather than building segments of roadways <br /> number of continuous routes that do exist. At times as property develops. Waiting until development and/ <br /> this results in traffic using county and local streets or redevelopment occurs does not protect the route, it <br /> to get to destinations that could be better served by can lead to increased acquisition costs and it may not <br /> having additional continuous routes. Implementation occur in the correct timeframe. Things the City can <br /> of improvements to US 169 and US 10 (along with do to preserve the routes: <br /> associated frontage and backage roads) will help Complete a corridor study to identify the preferred <br /> provide some of the connectivity that is currently alignment and location of the route <br /> lacking. However, these improvements are not <br /> • Adopt an official map <br /> programmed for the near future, so additional <br /> connections are needed. Advance purchase the right of way needed <br /> Figure 6-10: Future Functional Classification shows It is important to coordinate these efforts with <br /> the proposed future functional classification map MnDOT and Sherburne County if the efforts impact <br /> for the City of Elk River. This map includes facility county or state routes to ensure that an alignment <br /> upgrades to collector and arterial routes on county can be identified that serves the transportation need, <br /> roadways identified by Sherburne County as part of its minimizes impacts to existing development (regardless <br /> long-term transportation plan. Some of the changes in of use), and has the support of the required agencies. <br /> functional classification include constructing additional It also provides an opportunity to pool funding <br /> roadways (shown as dashed lines) or segments of resources. <br /> roadways. It should be noted that the proposed routes If proactive elements are not completed in time and a <br /> shown on the map are conceptual only. Discussions development does come along, it is important for the <br /> between the city and county will occur prior to City to include the locations of potential connections <br /> any new roadway construction. As part of these as part of discussions with property owners and <br /> discussions, the city and county will identify ways to developers prior to them submitting an official <br /> minimize impacts to existing residential and park uses. application for approval. <br /> Other changes over time may include additional <br /> investments such as roadway widening (on minor Summary of Roadway Improvements <br /> arterials), pedestrian and bicycle facilities, limiting and Changes <br /> driveway access for newly constructed segments, <br /> consolidating driveway access when redevelopment The previous sections highlighted a number of <br /> occurs, etc. roadway network changes and improvements. <br /> Figure 6-11 shows all of the proposed changes <br /> In addition to changes on the county network, there graphically. Some of the proposed changes, such as <br /> are also classification changes recommended for the connection between Proctor and Upland Avenues <br /> collector roadways on the city system. Most of along the School Street alignment will not be made <br /> the proposed collector roadways are a continuation unless or until requested by the affected property <br /> owner. <br /> Chapter 6: Transportation / 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.