Laserfiche WebLink
TASK 2: Rank catchments based on pre- and post BMP installation District <br /> modeling estimate <br /> TASK 3: Refine/develop cost estimates (there are some standard costs District/City <br /> but they can be refined based on local information) <br /> TASK 4: Rank catchments using cost/benefit analysis District/City <br /> STEP 5: FINAL REPORT Target Fall 2015 <br /> TASK 1: Contents of final report include: District <br /> a) Executive summary: include cost/benefit ranking table <br /> (ranking catchments,not individual BMPs); using <br /> standardized format <br /> b) Required maps: subwatershed and all catchments(one <br /> overview map); individual catchments (one map for each <br /> priority catchment- can be within individual catchment <br /> descriptions section); catchment connectivity(one map or <br /> diagram showing flow routing between all catchments and <br /> receiving water) <br /> c) Catchment descriptions: profile for each priority <br /> catchment must include pertinent catchment characteristics <br /> (such as model inputs),written description of existing <br /> conditions, catchment overview map showing potential <br /> BMP locations, and description of potential BMP's <br /> d) Cost table using standardized format(local cost <br /> modifications allowed) <br /> e) Appendix: model descriptions,protocol/methodology, <br /> definitions references <br /> TASK 2: Presentation at a workshop hosted by City(Optional) City/District <br /> STEP 6: IMPLEMENTATION Not a deliverable of MOU <br /> TASK 1: Obtain landowner approvals(if applicable) City <br /> TASK 2: Put together site-specific final design package City <br /> TASK 3: Secure retrofit funding City/District <br /> TASK 4: Conduct bidding for construction City <br /> 2014 ORONO LAKE SUBWATERSHED ASSESSMENT AGREEMENT <br />