My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. SR 03-15-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
03/15/2004
>
6.5. SR 03-15-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:28 AM
Creation date
4/12/2004 2:36:19 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R. Green Company <br /> <br />6.5 <br /> <br />March 10, 2004 <br />File: 822550J-0060 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: <br /> <br />VVVVTP PRIMARY DIGESTER COVER REPLACEMENT <br />AUTHORIZATION TO ADVERTISE FOR BIDS <br /> <br />Dear Council Members: <br /> <br />We have completed the plans and specifications for the WWTP Pdmary Digester Cover <br />Replacement project. We have worked with Gary Leirmoe, Chief Operator, and his staff in <br />preparing these documents. The project includes the replacement of the cover over the pdmary <br />digester, which is approximately 30 years old. In addition, since the digester will be opened and <br />emptied, the mixing system, which is of the same age, is planned to be replaced. We will also <br />inspect the internal piping and concrete structure and anticipate there will be some repair work <br />needed. The amount of work on the concrete structure will not be able to be quantified until the <br />structure is opened. In addition, we have determined that a safety rail should be installed around <br />the perimeter of the structure. The final piece of the project is a new coating on the outside of the <br />concrete structure that will seal cracks in the vessel. Because of the uncertainty of some of the <br />internal work that may be required once the structure is open, at this point we are only able to <br />provide a range of estimated construction cost. We are estimating construction cost in the range of <br />$650,000 to $725,000. <br /> <br />Attached is a resolution for the City Council's consideration, approving the construction plans and <br />authorizing the Advertisement for Bids. The bid date selected by staff is Apd113, 2004. We would <br />anticipate having the bids ready to present to the City Council at your Apdl 19, 2004, meeting. <br /> <br />If you have any questions regarding this issue, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br />-i-er~~j~. a~~ <br /> <br />TJM:sw <br /> <br />Enclosure <br /> <br />Ltr-031004-Council.doc <br /> <br />2550 University Avenue West · Suite400N · St. Paul, MN 55114 · 651/644-4389 fax651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.