Laserfiche WebLink
That Licensee is in strict COlnpliance with all other terms, <br />conditions and requirements of this License,.including specifically, <br />but not limited to, the operational requirements, perfon~ance <br />standards and environmental monitoring requirements of sections <br />4, 6, ?, and 8; and the requirements of sections 17 and 25 to make <br />prompt payment of all fees due to the City. No demolition debris <br />may be accepted at the demolition debris landfill if this condition <br />is not complied with. Licensee must imrnediately stop accepting <br />demolition debris upon wr/tten notice from the City that there is a <br />violation of this condition. <br /> <br />(04) Other Related Operations. No other operations or activities, whether or <br />not related to the Landfill, shall be pen-nitted or allowed on the Landfill Property <br />unless this License is first amended to specifically allow such operations and to <br />specify the applicable conditions except mining activities or other operations <br />licensed or permitted sepm'ately by the City. <br /> <br />4.) Specific Additional Operational Requirements. <br /> <br />(01) Leachate Transmission Pipes. Licensee shall verify to the City every four <br />(4) years that the existing leachate transmission pipes do not leak. <br /> <br />(07_) Backup Leachate Pumps. Licensee shall maintain ~ backup pumps for use <br />in the event of pump failure at the l~achat~: ~i wet well and/or leachate storage <br />tank on-site; o~ Shall maintain provisions for <br />restoring temporm-y leachate pumpi~ within a 24-horn' period <br />cU~en{: <br /> <br />(03) Leachate Holdin~ Tmzk. Licensee shall ensure that the leachate holding <br />tank is pumped out on a regular schedule. It shall be a violation of this License to <br />allow leachate to collect on the liner to a depth exceeding one foot due to the <br />leachate holding tank being full. <br /> <br />(04) Gas Ventin,o System. Licensee shall conduct active landfill gas venting in <br />accordance with approved plans and shall construct additional phases of the <br />~ at the time of final cover construction. <br /> <br />(05) Phase IV Water QUality Monitorint Work Plan. The Phase IV Water <br />Quality Monitoring Work Plan which describes the sampling fi-equency, <br />pm-ameters, protocols and reporting fi'equency for landfill gas, leachate, leachate <br />piezometers, leachate lysimeterS, residential wells, groundwater monitoring wells <br />and surface water shall be updated annually to reflect changes in the monitoring <br />systems. The monitoring plan shall yield adequate information for assessing the <br />effectiveness of the landfill gas control system in decreasing VOC contaminants <br />in the groundwater .............. v .............. vv ~ ~'~ ....... ~. <br /> <br /> <br />