My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 03-15-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
03/15/2004
>
6.2. SR 03-15-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:28 AM
Creation date
4/12/2004 2:35:49 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Landfill will be required to conduct a Feasibility Study and submit it to City <br />staff on schedule determined by City staff. <br /> <br />(44- ~9) Construction q)ualiW Assurance Reports. A Construction Quality <br />Assurance (CQA) Report shall be submitted to the City prior to the placement of <br />waste on newly constructed lined areas. A CQA report shall also be submitted <br />for Landfill areas which receive final cover. The report shall demonstrate that <br />the work is completed to the plan specifications. The Report shall be certified by <br />an engineer registered in the State of Minnesota and shall include but not be <br />limited to: <br /> <br />(a) All relevant construction specifications; <br /> <br />(b) All shop drawings for prefabricated components; <br /> <br />(c) Photo documentation of all critical aspects of construction; <br /> <br />(d) <br /> <br />Deflection testing results for leachate collection and transmission <br />pipes; <br /> <br />(e) <br /> <br />Narrative description of all as-built variances from the plans and/or <br />specifications; <br /> <br />(f) As-built cross-Sections of the liner sub grade; <br /> <br />(g) <br /> <br />As-built elevations for all pipe inlets and outlets and pump- <br />on / pump-off controls; <br /> <br />(h) Completed manufacturer warranties; <br /> <br />(4-~ ~) Permittee shall notify the City at least two (2) days in advance or <br />liner barrier layer installation or final cover barrier layer installation. The <br />Permittee shall assist the City in arranging inspection of the site at any <br />reasonable time the CiB~ requests. The Permittee shall keep the City informed of <br />ongoing construction progress and shall specifically notify the City of significant <br />changes encountered in the geological, hydrological, or construction conditions. <br />The City may reasonably require work which is covered or otherwise obscured <br />prior to City inspection, to be re-excavated for City Inspection. <br /> <br />(-t4-:!i) Temporar~ Fencing- On-Site Litter Control. Litter control fences <br />shall be maintained around the working area(s) of the Landfill to prevent the <br />blowing of paper or other litter on or off site. The Permittee shall assign <br /> <br />8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.