Laserfiche WebLink
MAR-lZ-ZOO4 08:3gAM FROIVI"ERMU 763-441-80gg T-Bg? P.O03/OO4 F-183 <br /> <br />Page 2 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />March 9, 2004 <br /> <br />$.2 Review and Adopt Electric Reliability Standards <br /> Disu'ibuti.on Reliability Standards policy was reviewed and the commission was asked their preference as <br />to keeping the longer version or shorter version. James Tralle expressed the importance of leaving in the <br />section pertaining to planned outage notifications, Jen'y Talde questioned the record keeping of ~ransmisslon <br />voltage loss with GRE. Bryans Adams stated that it has been difficult to get transmission voltage and outage <br />information fi:om GRE. James Tralle asked the importance ofwansmission information and Bryan Adams said <br />it was mainly for our infol~ation in responding to outages. <br />Sames Tralle moved to approve the short version of the Distribution Reliability Standards with the addition of <br />the planned outage notifications, seconded by Jerry Takle. Motion carried 3-0. <br /> <br />5.3 Review and Consider Authorization to Hire Lineperson <br /> Bryan Adams discussed the need for an additional lineperson. John Dietz questioned how he would be <br />utilized. Glenn Sundeen explained the situations that would require the extra person. <br />James Tralle moved to approve the l&ing of an additional line person, Jerry Talde seconded. <br />Motion carried 3-0. <br /> <br />5.4 Update ERMU move to New Administration Building <br /> Bryan Adams updated the Commissioners on the projected move date with the possible closing of the <br />King Avenue office on Friday, April 30~. He then handed out a proposed brochure to be sent with the April <br />bills informing our customers of the upcoming move, with another brochure to be sent with the May bill telling <br />them about our new location. Discussion followed regarding the possible shared expenses with the City at the <br />new location for maintenance, cleaning of the office and monthly bills for power, gas, etc. James Tralle asked <br />if the project was still under budget, Bryan Adams stated it was. <br /> <br />5.5 Review and Consider Water Bulk Rate <br /> The new bulk water station is now operational. Discussion followed regarding the use and rates. A letter <br />was sent m the Chief of Police, JeffBeahen, regarding the new facility and asked them to be aware of any <br />unauthorized hydram use. James Tralle expressed his concern that the police depm'anent should be aware of <br />what a bacldlow preventer looks like so as to better patrol for violations. Bryan Adams said he would provide a <br />picture to the police department. <br /> <br />6.1 Review MMUA Bond Pool Concept <br /> Bryan Adams explained the MMUA Bond Pool Concept. Jerry Talde questioned the rime period. James <br />Tralle questioned the bond rating. It was the consensus that someone from MMUA appear at the next meeting <br />to maswer some questions. <br /> <br />6.2 Review and Con_.~i_der Bid Tabulation for 600 amp Switchgear <br /> The bid tabulation for the 600 amp Switchgear was reviewed, wi~ Bryan Adams asking for authorization <br />to purchase 10 aluminum units from the low bidder, Wesco. These would be shipped at different times tluough <br />out the year. <br />Motion by ~erry TakIe to approve purchasing the equipment from Wesco, seconded by James Tralle. Motion <br />carried 3-0. <br /> <br /> <br />