Laserfiche WebLink
Planning Commission Minutes Page 2 <br /> August 26,2014 <br /> Chair Johnson opened the public hearing. There being no public comment, Chair Anderson <br /> closed the public hearing. <br /> Motion by Commissioner Jeremy Johnson and seconded by Commissioner Keller to <br /> recommend approval of the request by Starbucks for a Conditional Use Permit to <br /> amend the Elk Park Center PUD Agreement,with following language: <br /> Wall Signs (Multi-Tenant Building) <br /> 1. Fascia signs for individual retail tenants shall be for store identity only. <br /> 2. Capital letters shall be no larger than 32" high; lower case letter shall be no larger <br /> than 24" high. Signs shall be centered over the entrance doors to the tenant <br /> space, or the leased area, but in no case shall they extend closer than 3'-4' from <br /> the projected lease line. <br /> 3. These signs shall be internally illuminated, individual letters placed on a 4" <br /> square electrical raceway,painted to match the brick facia. <br /> 4. No signage shall be permitted on the sides or rear of the building, other than that <br /> required for delivery identification or traffic control. For sides of buildings facing an <br /> arterial road, one sign not exceeding 20 square feet shall be allowed. <br /> 5. Attachment D illustrates a typical wall sign. <br /> Motion carried 7-0. <br /> 5.2 Request by Brian Brehmer for Conditional Use Permit for Car Wash at <br /> Ralphie's Victory Lane, 13784 Highway 10, Case No. CU 14-18 — Public <br /> Hearing, continued from July 22, 2014 <br /> The staff report was presented by Zack Carlton. Staff recommended approval with the three <br /> conditions listed in the report. <br /> Chair Johnson opened the public hearing. There being no comment, Chair Johnson closed <br /> the public hearing. <br /> Chair Johnson stated he did not see any issues with the request. <br /> Motion by Commissioner Jeremy Johnson and seconded by Commissioner <br /> Konietzko to recommend approval of the request by Brian Brehmer for a Conditional <br /> Use Permit for a car wash,with the following conditions: <br /> 1. The Conditional Use Permit is not a building permit and the applicant must <br /> apply for and receive approval of required building and sign permits before <br /> construction may begin. <br /> 2. Staff approval of a revised landscape plan prepared by a landscape architect. <br /> 3. Staff approval of revised site, drainage, and utility plans <br /> Motion carried 7-0. <br /> 6. General Business —None <br />