My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4. ICESR 05-15-1997
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
1996-1999
>
1997
>
05-15-1997
>
4. ICESR 05-15-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2014 10:52:03 AM
Creation date
9/16/2014 10:22:04 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
5/15/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED PROPOSAL BY SUB-COMMITTEE <br /> EXPENSES: <br /> • SALARIES: The salary amount we adjusted for 1995-96 season due to the late November 15th start down to S65,000 <br /> from the Feasibility Study and increased it by S2,000 to$76,000 for the 1996-97 season. <br /> The present Arena Manager salary is$30,250, part time Ice crew is about 511,500 and concession <br /> workers are about$5700 for the past 1994-95 season for a total salary of$47450. For 1995-96 the budget figure of <br /> $65,000 is a good number for the two rinks would only be open for 6 months. The 1996-97 increase to$76,000 <br /> would increase both Ice crew and concessions workers as well as increase the Arena Manager's Salary. At present <br /> we have one full time Arena Manager and one half time employee during the skating season and other part time <br /> Ice Crew(5-6)and Concession(5-6)workers. <br /> BENEFITS: The benefits we felt were high but if the City/EDA takes over Operations of the Arenas this would be the <br /> same as the rest of the city employees. At present the Arena Manager receives a$1000 IRA annually and paid <br /> medical Blue Cross Blue Shield insurance coverage S1700. The Arena Manager also receives mileage at a rate of <br /> } <br /> •S.25 cents per mile which cameto about$450 in 1993-94. <br /> • <br /> REPAIRS Fiscal year ending 1994 & 1995 shows the actual Repairs and Maintenance cost at about $14,500. <br /> &MTCE. We thought the$39,000 was on the high side but Ieft it as is for the full 1996-97 season. We did reduce it <br /> for the partial season of 1995-96. We feel some of the expenses could be reduced by using city staff when needed <br /> for special projects. And to be able to use city owned equipment instead of renting it. <br /> i <br /> UTILITIES: The utilities we felt were very high. The total for 1993-94 was S33,500.and the Actual +Budget for <br /> 1994-95 season is at about$33,000. The biggest expense for the utility group is the Electric at about S23,500 <br /> 1993-94 and$24,500 for 1994-95. Gas at S7000,Telephone at$1800 and sanitation at$1,100. The new building <br /> will be bigger and a larger ice sheet but with newer technology should be more efficient also. The Elk River • <br /> Municipal Utilities Commission has given this project an Economic Development Rate for a 5 year term. The <br /> estimate for tripling the electric usage with the special rate would put the cost at about 563,000 for the 1995-96 <br /> • season. Doubling these other expense the total would be about$82,000. So we feel a conservative estimate of <br /> ' $90,000 is justified. See Attached. <br /> INSURANCE: There is a new Insurance Company, Cartier Insurance Agency Duluth, MN that strictly insures Ice <br /> Arenas and the estimate we received from them was$20,000. 1993-94 insurance totaled $13,000 which includes <br /> Property$2560,Liability $3400+Open Skate$155+Rollerblading 5250+Dance& Circus 5130,Employee <br /> • <br /> Dishonesty$110, Crime S150,Boiler$1600, Worker Compensation S3200, Accident&Medical$900. <br /> _ZAMBONI: • Zarnboni.Maintenance and Fuel for 1993-94 totaled$2404. .1994-95 is estimated at$3,200....We felt the <br /> maintenance was a Iittle on the high side seeing that in the 3 previous years we did not total $7,000. But <br /> recognizing that the Zamboni is aging that an increase to 56,000 in 1996-97 should be adequate. <br /> DRY FLOOR Increased to$2,000. <br /> EVENTS: <br /> EXISTING In November 1995 the debt on the existing arena will be paid off. The balance as of May 1, 1995 is <br /> ARENA about'S15,776. The debt is held by three banks, First National Bank of Elk River,Bank of Elk River, <br /> DEBT: and State Bank of Rogers. The payment is S2,500 principle plus interest which is based on one <br /> percentage above the T-Bill rate, not less than 8%and not more than 10%. The numbers are shown based <br /> on an 8%rate. <br /> PAYMENT There is a request by the committee members to offset some of the Salaries by payment from <br /> OF PARTIAL the City(Park fees)or Park and Recreation Board for improvements. This may only be needed for the <br /> SALARIES: first three years or so depending on the bond structure. <br /> • Revision Date: 2/27/95,revfeas3,dpm <br />
The URL can be used to link to this page
Your browser does not support the video tag.