My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 09-15-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
09-15-2014
>
4.7. SR 09-15-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2014 8:44:58 AM
Creation date
9/12/2014 8:41:23 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BQL-TON 8- M F:= N K , I NC::, <br /> Consulting Engineers & Surveyors <br /> " 7533 Sunwood Drive NW• Ramsey, MN 55303 <br /> Phone (763)433-2851 • Fax(763)427-0833 <br /> www.bolton-menk.com <br /> July 28,2014 <br /> Honorable Mayor and City Council <br /> 13065 Orono Parkway NW <br /> Elk River,MN 55330 <br /> RE: Yale Street <br /> Street and Utility Improvements <br /> Project No.: N15.108487 <br /> Honorable Mayor and City Council Members, <br /> Enclosed for your review is the Yale Street- Street and Utility Improvements Feasibility Report.The <br /> report includes street and utility improvements to extend Yale Street from Yale Court south to a future <br /> intersection along Trunk Highway 169. This report includes the proposed improvements,estimated <br /> construction costs and right-of-way impacts. <br /> Sincerely, <br /> BOLTON & MENK, INC. <br /> Cody Holmes,P.E. <br /> Project Engineer <br /> Cc: Justin Femrite,P.E.,City Engineer <br /> Mark Kasma,P.E., Senior Principal Engineer <br /> DESIGNING FOR A BETTER TOMORROW <br /> Bolton &Menk is an equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.