Laserfiche WebLink
BID SCHEDULE FOR:BITUMINOUS TRAIL SECTION <br /> CITY OF ELK RIVER,MINNESOTA <br /> • ITEM <br /> NO. ITEM UNIT QTY UNIT PRICE TOTAL PRICE'.'. <br /> SCHEDULE 1.0-TRAIL <br /> 1 COMMON EXCAVATION CY 23 $15.00 $345.00 <br /> 2 TYPE 41 WEA 50055Y BITUMINOUS TON 13 $30.00 $390.00 <br /> 3 AGGREGATE BASE,CLASS 5 TON 30 $12.00 $360.00 <br /> 4 SEEDING ACRE 0.02 $1,000.00 $20.00 <br /> 5 SEED MIXTURE 50A LB 1 $19.00 $19.00 <br /> 6 COMMERCIAL FERTILIZER ANALYSIS 6-24-24 LB 4 $4.75 $19.00 <br /> 7 MULCH,TYPE 1 TON 0.04 $500.00 $20.00 <br /> 8 WOOD FIBER BLANKET SY 90 $1.50 $135.00 <br /> T SCHEDULE 1.0-COUNTY ROAD 1 SIDEWALK-TOTAL $1,308.00 <br /> 5%CONTINGENCIES $65.40 <br /> BID SUMMARY-TOTAL $1,373.40 <br /> THIS ESTIMATE IS FOR A TRAIL 100'LONG X 10'WIDE. COST PER LINEAR FOOT <br /> OF TRAIL IS$13.75 <br /> • <br /> COMMON EXCAVATION(12'WIDE) (100 X 12 X 6/12)/27 <br /> TYPE 41 WEA 50055Y BITUMINOUS(10'WIDE) (100 X 10 X 2/12)/27 X 1.98 <br /> AGGREGATE BASE,CLASS 5(12'WIDE) (100 X 12 X 4/12)/27 X 1.86 <br /> SEEDING (2 SIDES X 4 X 100)/43560 <br /> SEED MIXTURE 50A 0.2 ACRES X 50 LBS/ACRE <br /> COMMERCIAL FERTILIZER ANALYSIS 6-24-24 0.2 ACRES X 200 LBS/ACRE <br /> MULCH,TYPE 1 0.2 ACRES X 2 TONS <br /> WOOD FIBER BLANKET (2 SIDES X 4 X 100)/9 <br /> • <br /> \trail-est.xls 4A <br />