Laserfiche WebLink
Memo to the Park and Recreation Commission/Cass Improvements <br /> September 8, 1999 <br /> Page 2 <br /> • and Parks Department would like to construct a larger maintenance <br /> structure to replace the existing 12' x 14' shed. A new maintenance structure <br /> might also serve as an entrance booth to collect entrance fees for spectator <br /> events if it is located and designed properly. Staff feels that if more than one <br /> structure is built, they should be designed together to have a sensible <br /> relationship to each other and with similar materials. <br /> Concept B <br /> Concept B represents an alternative concept for a concession structure with <br /> bleachers and picnic shelters built in. Commissioner Dave Anderson brought <br /> the alternative concept to staffs attention. The structure would be on top of <br /> a raised platform with concessions and picnic tables under canopy and the <br /> sides of the platform as bleachers. The structure would incorporate the <br /> existing utility and irrigation structures and might help control some of the <br /> water causing the erosion problems. With this concept the bathrooms could <br /> be incorporated into the structure or separately as with the Concept A. The <br /> Streets and Parks Department would still need a maintenance shed to house <br /> maintenance equipment. Phil Hals, the Streets and Parks Director, thought <br /> the idea had merit and should be reviewed by the Commission. <br /> Recommendation <br /> • Staff recommends that the Park and Recreation Commission review the two <br /> concepts for concession structures, bleachers, restrooms and maintenance <br /> structure and make a recommendation. <br /> • <br /> \\elkriver\sys\shrdoc\planning\stevewen\parkmmo\cassimp.doc <br />