My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. ERMUSR 09-09-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
09-09-2014
>
5.5. ERMUSR 09-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 3:45:27 PM
Creation date
9/9/2014 11:45:45 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/9/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
located on private property behind a locked gate. Should ERMU require customers who have <br /> installed gates that restrict access to ERMU equipment to relocate the equipment at their cost? <br /> ACTION REQUESTED: <br /> Staff requests Commission discussion and direction through policy regarding access to private <br /> property while maintaining code requirements and consideration for employee safety. <br /> ATTACHMENTS: <br /> • City of Elk River Ordinances regarding authorities of the Utilities Commission to create <br /> rules and regulations for safe and reliable operation. <br /> • ERMU Policies regarding access to ERMU equipment and meters on private property. <br /> • Excerpts from the 2011 NESC regarding required inspections of equipment. <br /> • Examples of ERMU door hanging notices used in the past. <br /> ■\n POWERED BY <br /> Page 3 of 3 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D To S ER V E <br /> 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.