My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.0. PRSR 09 10 2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2014
>
09-10-2014
>
10.0. PRSR 09 10 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2014 10:43:16 AM
Creation date
9/9/2014 10:43:15 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
9/10/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> • Complete trail connection between Mississippi River/Main Street and the Great Northern Trail <br /> • Sign trail connections as part of the Signage and Wayfinding Plan <br /> • Park signage as part of the Signage and Wayfinding Plan <br /> • Conduct a comprehensive recreation facilities study to evaluate the Senior Activity Center,Ice Arena, <br /> Lions Park Center,and the Barn and determine if they should be renovated,replaced on their current site, <br /> or consolidated into a centrally located facility <br /> Vision Projects <br /> • Turf Multi-Use Field(in conjunction with School District) <br /> • Fieldhouse(in conjunction with School District) <br /> • Ice Arena <br /> • Woodlands Trails Park -Nature Center/Chalet <br /> • Orono Park-Miracle Field <br /> • YAC-Additional Pinwheel <br /> • Baseball Town Field <br /> • Community Center <br /> • Add bluff lands to the park system along the Mississippi River as opportunities allow <br />
The URL can be used to link to this page
Your browser does not support the video tag.