My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. SR 09-08-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
09-08-2014 SPECIAL
>
4.1. SR 09-08-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2014 11:58:33 AM
Creation date
9/5/2014 11:47:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/8/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division Performance Measures & Goals for 2015 <br /> Division: WASTEWATER <br /> Completed by: Matt Stevens <br /> Date: May 21, 2014 <br /> Performance Measure 2013 Actual 2014 Estimated 2015 Projected <br /> Number of Liftstations 21 21 21 <br /> Miles of Sanitary Sewer Main 78 78 78 <br /> Flow in Millions of Gallons/Day 1,18 1.2 1.21 <br /> Number of Employees 6 5 6 <br /> Related Vision Statement <br /> Division Goal Goal/Objective Comments <br /> W WTP upgrade Work with engineers and contractor,to Make sure that staff and contractors understand that the W WTP needs to <br /> maximize the results of the two year remain in compliance at all times. <br /> expansion, <br /> Enforce FOG's Ordinance that was Meet with restraunt owners,and managers I plan to meet with all the grease contributors in town,starling with the <br /> put into affect on May 51h 2014 to inform them of the new ordinance,and bigger producers of grease Erst <br /> expectations <br /> Glean 21 liftstations 2 timeslyear remove Grease,Grit,and clean Floats The Jet truck and two city staff will be running everyday in order to get thi <br /> also jet half the city sewer lines Approximately 40 miles worth accomplished. <br /> Continue to inspect the sanitary When the camera crew finds an area with If we can work as a team,we will beable to get the city's sewer system in <br /> sewer system heavy grease or roots,they will call the the best shape possible. <br /> jetting crew to come and remove them. <br /> Implement a preventative Hire quality flow to come in and inspect all We've upgraded almost every liftstaticn panel in the city.I now want to get <br /> maintenance program on all 21 pumps at every station on a program of replacing pumps that need to be With our new shop being <br /> Liftstations built we will have room for us to keep the old pumps as spairs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.