My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 09-02-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
09-02-2014
>
8.1. SR 09-02-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 8:35:27 AM
Creation date
8/29/2014 7:52:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> CONDITIONS OF APPROVAL <br /> Approve by resolution the final plat for DHJ, sub)ect to the following conditions. <br /> 1. Surface Water Management Fee, one (1) lot at the rate applicable at the time <br /> of Final Plat approval. <br /> 2. All appropriate grading permits must be obtained prior to commencing work <br /> on the site. <br /> 3. Grading and Erosion Control Plan be submitted and approved by the city <br /> engineer prior to the issuance of building permits. <br /> 4. Water Availability Charge be paid prior to releasing the plat for recording. <br /> 5. Park Dedication shall be provided in the form of cash for one (1) lot at the rate <br /> applicable at the time of Final Plat approval. <br /> 6. Any item or condition found that indicates the site is likely to yield <br /> information important to pre-history or history shall be reported to the city <br /> immediately. Further, the city reserves the right to stop work authorized in its <br /> approval until the site is appropriately investigated and work is authorized. <br /> 7. Service Connection Plan approved by city engineer. <br /> r ® w € R10 8 <br /> NATUREI <br />
The URL can be used to link to this page
Your browser does not support the video tag.