My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 09-02-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
09-02-2014
>
8.1. SR 09-02-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 8:35:27 AM
Creation date
8/29/2014 7:52:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> Elk - Request for Action <br /> River O. <br /> To Item Number <br /> Mayor and City Council 8.1 <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearinj ISeptember 2, 2014 Chris Leeseber ,Park Planner- Planner <br /> Item Description Reviewed by <br /> Final Plat Resolution: Douglas Warneke: Final for Cal Portner, City Administrator <br /> DHJ Plat Reviewed by <br /> Action Requested <br /> Approve,by resolution,Final Plat to Douglas Warneke for DHJ Plat, Case No. P 14-03,with the <br /> following conditions: <br /> 1. Surface Water Management Fee, one (1) lot at the rate applicable at the time of Final Plat <br /> approval (currently$214). <br /> 2. All appropriate grading permits must be obtained prior to commencing work on the site. <br /> 3. Grading and Erosion Control Plan be submitted and approved by the city engineer prior to <br /> the issuance of building permits. <br /> 4. Water Availability Charge be paid prior to releasing the plat for recording (currently <br /> $3,214.84). <br /> 5. Park Dedication shall be provided in the form of cash for one (1) lot at the rate applicable at <br /> the time of Final Plat approval (currently$3,712). <br /> 6. Any item or condition found that indicates the site is likely to yield information important to <br /> pre-history or history shall be reported to the city immediately. Further,the city reserves the <br /> right to stop work authorized in its approval until the site is appropriately investigated and <br /> work is authorized. <br /> 7. Service Connection Plan approved by city engineer. <br /> Background/Discussion <br /> Case No. P 14-03 —Public Hearing <br /> The applicant proposes to subdivide two lots into three residential lots. All lots meet the minimum size <br /> and frontage requirements. The new lot will be accessed from Holt/8"' Street. <br /> The proposed Final Plat is consistent with the Preliminary Plat as approved by the City Council at their <br /> July 21, 2014 meeting. <br /> Financial Impact <br /> None <br /> Attachments <br /> • Final Plat <br /> • Resolution 14- <br /> P a w E A E U s r <br /> NaA f RE] <br />
The URL can be used to link to this page
Your browser does not support the video tag.