My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 08-12-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2014
>
08-12-2014
>
6.1. ERMUSR 08-12-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2014 4:43:06 PM
Creation date
8/13/2014 4:41:10 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/12/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk - Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> August 12, 2014 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered 3 new residential water meters. <br /> • Sealed the water meter and took curb stop ties from 6 water services. <br /> • Shut off 4 water services and 3 electric services, also turned on 4 water services and 3 <br /> electric services. <br /> • Went on 11 service calls. <br /> • Completed 3 locates. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples; all confirmed negative for <br /> Coliform Bacteria. <br /> • Completed 20 routine fluoride samples. All samples met MDH standards. <br /> • Completed 7 raw water nitrate samples, 7 treated water nitrate samples, and 2 radiochem <br /> samples. All samples are routine samples that we must do in order to fulfill our testing <br /> requirements with the Minnesota Department of Health. <br /> • 28 of the 40 rain barrels have been sold so far. Michelle Canterbury has been putting <br /> notices in The Connector to let our customers know there are still some left for purchase. <br /> • 228 fire hydrants have had maintenance performed on them so far this summer. <br /> • One Way Building Services has been working on installing the Verizon Antennas on the <br /> Gary and Johnson Towers. Both projects are expected to be completed by the end of <br /> August. <br /> • Pete has completed 595, of the over 800 curbstop ties, that are missing from our curbstop <br /> ties catalog. <br /> • Rodney Schreifels from the Parks Department called me a couple of weeks ago <br /> concerning a noisy irrigation meter at the Chamber of Commerce building. I went over to <br /> check it out and discovered that we have no record of the meter they're using for <br /> irrigation. We looked back in the billing, and to the best of our knowledge they have <br /> never been billed for the 5.2 million gallons of water they have used to irrigate their <br /> property. Rodney and Cal Portner are working with the Chamber to figure out how to get <br /> the situation resolved. <br /> MI POWERED DY <br /> Page 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.