My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. SR 08-11-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
08-11-2014 SPECIAL
>
3.1. SR 08-11-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 3:31:11 PM
Creation date
8/8/2014 8:24:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/11/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Safety Building—The Utilities line item is adjusted to reflect recent trends from our energy <br /> management system. The Building RepairlMaintenance changes for costs associated with gun range repairs <br /> and material disposal. <br /> Community Operations and Development Budgets (proposed)- <br /> Engineering—The General Fund has revenue (engineering services reimbursement) which offsets <br /> approximately 70% of the time the city engineer and engineering tech II work on projects. This is higher <br /> than prior years since 2015 is a street reconstruction year. In order to easily track the cost we budget all <br /> salaries in the Engineering Department and chargeback the project funds. The Equipment Repair and <br /> Maintenance line item is decreased to offset copier costs in the Information Technology budget. <br /> Equipment Replacement Fund (2015-2019) <br /> The Equipment Replacement Fund is a section of the Capital Improvement Plan (CIP). The Equipment <br /> Replacement Fund covers replacement of wheeled equipment and vehicles. This fund was established to <br /> provide funding and long-range planning for the replacement of equipment. The fund is replenished on <br /> an annual basis through charges paid by each General Fund department and Pinewood Golf Course <br /> through their operating budgets. The amount charged to each department is allocated on the estimated <br /> replacements over the next 10 years and updated yearly. In addition,the fund receives a portion of the <br /> Payment in Lieu of Tax (PILOT) from Elk River Municipal Utilities,Local Government Aid (LGA), <br /> interest earnings, and auction proceeds. The fund maintains a significant fund balance,but is necessary <br /> given the sufficient variability as we utilize cash reserves when several costly vehicles are replaced in the <br /> same year. The replacement cycle is continuously evaluated, based on costs and department use over the <br /> next several years to determine the optimal time to replace vehicles. <br /> If the Council would like any more information on any specific piece of equipment being <br /> requested, please let Suzanne Fischer (Fleet Committee Chair) know. <br /> The city's Fleet Committee is actively involved in the long-range planning of the replacement of the city's <br /> fleet and financial condition of the Equipment Replacement Fund. <br /> Storm Water <br /> Staff will begin reviewing the 2015 and 2016 storm water budget and the long-term plan for the MS4 <br /> permit requirements. <br /> General Fund Update <br /> An update on the overall General Fund revenue and expenditures will be provided. In early September, <br /> we should get the preliminary Net Tax Capacity (NTC) number from the County. We will then run tax <br /> impacts to residential and industrial/commercial properties. <br /> N:\Public Bodies\Agenda Packets\08-11-2014\3.1 sr budgetmemo0811(waiting for Cal to review).docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.