Laserfiche WebLink
. • Relocate park entrance and ski race staging area if east-west <br /> connector road is built <br /> • Buffer a east-west connector road with evergreens, trees and shrubs <br /> and berms <br /> • Include a paved trail along a east-west connector road <br /> • Add benches along paved trails <br /> Top of the World Park <br /> Approved park concept <br /> • Acquire an additional +1- 3 acres of land to the east with future <br /> development for a Trailhead with parking, play structure, and portable <br /> toilets <br /> • Pave the most northerly trail in Top of the World which would connect to <br /> Woodland Trails Park (the trail would have to be rerouted onto park <br /> property in order to pave it) or property would need to be purchased from <br /> Shiely Company <br /> • <br /> • <br /> \\elkriver\sys\shrdoc\planning\stevewen\parkmmo\apppks.doc <br />