Laserfiche WebLink
. • Looped path in northern park with floating board walk <br /> • Connect north and south with trail and boardwalk if feasible <br /> • Portable toilets <br /> Hillside City Park <br /> Approved park concept <br /> • 20' paved entrance drive in existing location <br /> • 12' paved trail through center of park connecting it the powerline <br /> corridor south of the site <br /> • Single track mountain bike trails <br /> • BMX track and facilities in the "dump area of the park" <br /> • Parking for mountain bike users and BMX users <br /> • Portable toilets <br /> Gagne Park <br /> Approved park concept <br /> • Use existing entrance road allowing adjacent residents access off of it <br /> • Prairie restoration in northern open field with a loop trail, picnic <br /> structure and tables, play structure, portable toilets, and parking lot <br /> • 2 ballfields and a soccer field in the southern open field <br /> • Paved trail around ballfields and in the woods along the Elk River <br /> • Benches and rest areas for pedestrians and canoeists along the Elk <br /> River <br /> • Secondary picnic area accessible by trail only <br /> • Acquire additional land adjacent the Elk River to the south and east if <br /> and when it becomes available to provide greater park river access <br /> Harris Island Park <br /> Approved park concept <br /> • Conservation park <br /> Meadow Park <br /> Approved park concept <br /> • Skating rink up to property line near 2nd Street <br /> • Sliding hill by clearing trees at the center of the site <br /> • Swing structure near the rear property line at the top of hill <br /> • Overstory trees delineating the street <br /> • Hedge and landscape screening adjacent to neighboring homes <br /> • <br /> \\elkriver\sys\shrdoc\planning\stevewen\parkmmo\apppks.doc <br />