My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.B. PRSR 02-10-1999
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
1993-2000
>
1999
>
02-10-1999
>
7.B. PRSR 02-10-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2014 3:10:01 PM
Creation date
7/28/2014 3:10:00 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
2/10/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Estimate of Site Improvements <br /> Hillside 5th Addition <br /> Quantity Unit Item Unit Cost Estimated Cost <br /> 1 Play structure 30,000.00 30,000.00 <br /> 1 Full Court 10,000.00 10,000.00 <br /> 400 If 10' Bituminous Trail 11.26 4,504.00 <br /> 615 If 6' Bituminous Trail 6.78 4,169.70 <br /> 3075 sf 5' Woodchip Path 1.00 3,075.00 <br /> 935 sf Concrete Walk 3.00 2,805.00 <br /> 16 1.5" BB Ornamental Trees 200.00 3,200.00 <br /> 19 4' BB Conifers 200.00 3,800.00 <br /> 20 #20 cont. Deciduous Overstory Trees 200.00 4,000.00 <br /> 1.6 Acres Grading and Seeding 1500.00 2,400.00 <br /> 5 Benches 100.00 500.00 <br /> 5 Picnic Tables 250.00 1,250.00 <br /> n/c Trail Corridor Trail <br /> n/c Trail Corridor Improvements <br /> • Total $ 69,703.70 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.