Laserfiche WebLink
• PRAIRIE RESTORATION-WOODLAND TRAILS <br /> CURRENT PROJECTS <br /> 1. Controlled bums - 5 zones <br /> 2. Removal of undesirable woody vegetation <br /> box elder, elm and some poplar <br /> FUTURE PROJECTS <br /> 1. Planting of grass to speed restoration <br /> 2. Planting of flowers to increase bio-diversity <br /> PRAIRIE RESTORATION-RR GRADE <br /> Co. Rd. 1 to Waterworks <br /> RESTORATION SCHEME (No current projects planned) <br /> 1. Burn site to be restored <br /> 2. Kill undesirable plants with herbicide (timing is important) <br /> 3. Select prairie type (short or tall) <br /> 4. Plant grasses and some flowers <br /> 5. Enhance site with flowers as needed <br /> Work with Boy Scout and Eagle Scout candidates on project including seed collection to <br /> reduce costs. <br /> U:\PAULAQ\RESTORAT.WPD <br /> • <br />