My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.C.3. PRSR MAINTENANCE 06-14-2000
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
1993-2000
>
2000
>
06-14-2000
>
9.C.3. PRSR MAINTENANCE 06-14-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 9:28:48 AM
Creation date
7/23/2014 9:28:48 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
6/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail Crack Filling <br /> • <br /> The youth STS crew has done paved trail crack filling the last four years. <br /> They use a cheap caulking grade of driveway crack filler and cover it with <br /> T.P. This material has no elastomeric properties, but does a good job of <br /> preventing loss of trail base material caused by rain and ants. Consequently <br /> our trails do not have the characteristic dips at each crack like so many trails <br /> do. <br /> I would like to see this program continue until we can find an alternative <br /> solution. The annual material cost will increase as our miles of trail <br /> increase. The cost this year should be about $200. I am working with the <br /> crew to get more production out of their materials. The labor cost is zero. <br /> 110 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.