My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8. PRSR 04-11-2001
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2001
>
04-11-2001
>
8. PRSR 04-11-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 8:55:20 AM
Creation date
7/17/2014 8:55:19 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
4/11/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> �!2Et1R IN REVIEW <br /> Street Projects Completed <br /> Seal Coating: Annually,we seal coat about 6 miles of residential streets. In 2000, the streets <br /> of Orono Lake Addition, Orono Parkway,Joplin Street, Country Crossing I and Country <br /> Crossing II, and the Sandpiper Estates were seal coated. <br /> Crack filling: An important maintenance tool that we do in the year prior to our seal coat <br /> program. In 2000 we crack filled Riverview Heights,Heritage Landing,Mississippi Oaks, and <br /> west Main Street. Crack filling in October has helped to balance our seasonal work load and <br /> has been very successful. <br /> Bituminous Patches and Overlay: The Street Department paved about 200 ton of asphalt <br /> on 173rd Avenue,west of Fillmore Street as a stop gap measure before a complete <br /> reconstruction in 2001 or 2002. Several small patches were contracted out to Viking Blacktop. <br /> Surface Water Management: 2000 was a year of minimal rains so surface water <br /> management was not a big issue,but we do have two drainage improvements scheduled for <br /> 2001 in the short term street goals section. <br /> Gravel Roads: Each year we try to add Class 5 to about one mile of gravel roads. In 2000, <br /> the Class 5 was placed on 211th Avenue, 22151 Avenue,223rd Avenue, and 227th Avenue. <br /> Park Projects Completed <br /> • Orono Park: Built garbage container corrals,installed handicap accessible picnic tables and <br /> replaced cushion material under the playground equipment. <br /> Lion's Park: Installed a playground unit, constructed a softball diamond and a bituminous <br /> trail was constructed from Jackson Avenue to the Boys and Girls Club (contractor paved). <br /> Country Crossing I: Installed wood chip trail,removed brush and undesirable trees,ground <br /> out about 100 stumps, spade planted 19 red cedar trees, and started the memorial garden. <br /> Ridgewood East: Spade planted 10 spruce trees from the Wal-Mart site. <br /> Country Crossing III: Removed brush and undesirable trees,installed a bituminous <br /> basketball court (contractor paved) and installed playground equipment. <br /> Mississippi Oaks: Planted 24 trees. <br /> Meadow Park: Installed playground equipment. <br /> Deerfield IV: Removed diseased trees,planted shrubs in landscape boxes around the long <br /> slide. <br /> Railroad Trail: Relocated the access trail from Watson Street (contractor paved). <br /> County Road 1 Trail: Constructed a trail connection from the Proctor sidewalk to the <br /> County Road 1/Proctor intersection. <br /> ERYAC: Planted trees, started construction of the BMX track, and started construction of <br /> fields 5 and 6 (contractor grading). <br /> Trott Brook: Installed playground equipment, contractor poured concrete sidewalk, and <br /> contractor assembled playground equipment. Relocated barn to playground site, contractor <br /> installed foundation and contractor raised, moved and lowered barn at the new location. <br /> Ice Arena: Installed irrigation pipe,poured concrete around compressor equipment on east <br /> • side of building and constructed staff parking zone (contractor paved) <br />
The URL can be used to link to this page
Your browser does not support the video tag.