Laserfiche WebLink
• <br /> River's Edge works to secure DNR fishing pier <br /> by Nicole Jacob Diedrich has been the contact <br /> Staff writer 'We like to be involved in programs that person for the project, and has <br /> Members of the River's Edg people allow le to do fishing in the expressed enthusiasm for the <br /> group think they have found p p g project. While no specific <br /> an answer on how to generate (Mississippi) river.' plans for an Elk River pier <br /> interest in downtown Elk have been drawn yet, <br /> River. —Paul Diedrich, DNR Diedrich said that a typical <br /> The group has been in dis- pier is a "T" shaped wooden <br /> cussion with officials from the thing to kick off the riverwalk would cost between $20,000 <br /> structure about 25 feet long. <br /> Department of Natural project, tr n to think of dif- to $30 000. Accordin to He added that the entire proj- <br /> Resources (DNR) about build- ferent attractions to help River's Edge President Tony ect could take up to three <br /> ing a fishing pier on shoreline interest grow. This would give Mikols,the DNR would secure years to complete. <br /> in the downtown area. us the kick that the malls most of the funding and would "We like to be involved in <br /> This would really spark have for other places." use its own engineer to design programs that allow people to <br /> interest in the renovation of The pier would go in the pier. do fishing on the river," <br /> downtown," River's Edge Diedrich said. "Our studies <br /> between The Sunshine Depot DNR Montrose Area <br /> member Becky Doebler said. <br /> ,� and tile Cinema Building and Fisheries Supervisor Paul <br /> We were looking for some- Pier continued to page 5 <br /> Pier <br /> Co • ued from page 1 <br /> obsefSed anglers on the shore- (to the store)showing me what tainin the pier. If the DNR can <br /> line in Elk River. The site looks they caught. The kids beg me to obtain the city's partnership on ',1t,'"0:,;11 <br /> ` <br /> promising." start carrying live bait. (The the project, a design will be <br /> According to DNR fish popula- pier)would be a positive contri- developed over the next eight to r If''§ <br /> tion studies,river fish are natu- bution to the town." 10 months. w <br /> rally producing. Diedrich said Diedrich is now waiting to A year ago, the River's Edge , , = gy%that smallmouth bass fishing hear back from Elk River group had talked at length r <br /> has been particularly good, and Director of Planning Michele about constructing a paddle- ' <br /> there are also walleye.,northern McPherson, who was going to boat stage on the site where the <br /> pike and channel catfish in the approach the Park and fishing pier would go. That idea Here is the scene at the <br /> area. Recreation Committee about was abandoned when the group base of the river in the winter. <br /> Doebler has seen evidence of the project. The city owns the ran into difficulties securing One group would like it to <br /> this at the Trading Company. piece of land where the pier funding for the project and sup- include a fishing pier. <br /> "There are a lot of people who would go, and the city would port from the city. <br /> already fish there.They come in also be responsible for main- <br />