Trench rollers shall be self propelled and have a mass of not less than 4400 kg per meter (2960 <br /> III lb per ft) of width. <br /> C5 Mixture Temperature Controls <br /> If compaction is obtained by the ordinary compaction method, the minimum laydown <br /> temperature in all courses (as measured behind the paver or spreading machine) of the asphalt <br /> mixture shall be in accordance with the temperature requirements of Table 2350 - 11. <br /> Table 2350 -11 <br /> Mixture Temperature Control <br /> Air Temperature Compacted Mat Thickness, mm(A) <br /> °C (°F) 25 mm (1 in) 40 mm (1-1/2 in) 50 mm (2 in) 75 mm (3 in) or greater <br /> +0-5 (32-40) -- 129 (B) (265) 124 (255) 121 (250) <br /> + 6-10 (41-50) 130 (B) (270) 127 (260) 121 (250) 118 (245) <br /> + 11-15 (51-60) 127 (B) (260) 124 (255) 118 (245) 115 (240) <br /> + 16-21 (61-70) 121(B)(250) 118 (245) 115 (240) 113 (235) <br /> + 22-27 (71-80) 118 (245) 115 (240) 113 (235) 113 (235) <br /> + 28-32 (81-90) 113 (235) 110 (230) 110 (230) 110 (230) <br /> + 33 (91+) 110 (230) 110 (230) 110 (230) 107 (225) - <br /> (A) Based on approved or specified compacted lift thickness. <br /> (B) A minimum of one pneumatic-tire roller shall be used for intermediate rolling unless <br /> otherwise directed by the Engineer. <br /> The Engineer may specify or modify in writing (with concurrence from the Bituminous Engineer) <br /> • a minimum laydown temperature. <br /> 2350.7 Thickness and Surface Smoothness Requirements <br /> A Thickness <br /> After compaction the thickness of each course shall be within a tolerance of 6 mm (1/4 in) of the <br /> thickness shown in the Plans, except that, if automatic grade controls are used, this thickness <br /> requirement will not apply to the first course placed. This thickness requirement will not apply to <br /> a leveling course whether or not automatic grade controls are required. Any part of any course <br /> that is constructed to less than the minimum required thickness may be removed and replaced <br /> at the discretion of the Engineer. <br /> On that portion of any course constructed to more than the maximum permissible thickness, the <br /> materials used in the excess mixture above that required to construct that portion of the course <br /> to the Plan thickness plus 6 mm (1/4 in) will be excluded from the pay quantities and may <br /> require removal and replacement at the discretion of the Engineer. <br /> Cores taken for density determination shall be measured for thickness also. Each core shall be <br /> measured 3 times for thickness prior to sawing. Report the average of these three <br /> measurements. Each lot's average core thickness shall be documented and submitted to the <br /> Engineer. If the average of the two Contractor cores exceed the specified tolerance, an <br /> additional two cores may be taken in the lot in question. The average of all core thickness <br /> • measurements per course will be used to determine compliance with thickness specifications. <br />